ADR tank special provision TE7

Discharge needs two independent shut-offs in series: an approved quick-closing internal valve and an external valve, plus a blank flange.

The bottom discharge must have two shut-off devices in series that work independently: first an approved quick-closing internal stop-valve, then an external stop-valve, the internal one at one end of the discharge pipe and the external one at the other. The outlet of every external stop-valve must also be closed by a blank flange or an equally secure device. The internal valve must be built so that, if the pipe is torn away, it stays attached to the shell and closed.

equipmentquick-closing internal stop-valve of an approved type, external stop-valve, blank flange or equivalent at each external stop-valve outlet

Carried by 1 Table A entry

UN 2015

Source: ADR 2025 (ECE/TRANS/352), Volume II, section 6.8.4 (b), TE7, page 534.

Paraphrase in FreightUtils' own words, not the official text. Not yet reviewed.

ADR 2027 amendments (accepted, applying from 1 January 2027) are not yet reflected on this page.